Skip to content
Skip the drawing
  1. We install the controls. Then we watch them.

    Boiler, burner and pump controls for New York apartment buildings, on a screen you share with our engineers. A building that goes offline is flagged in five minutes.

    Office: weekdays 8 AM to 6 PM.

  2. It starts in the cellar

    Two boilers, their burners, the circulator pumps and one controller that runs them. We replace the aquastats and relay panels, and the burner's own safeties stay in charge of the flame.

    Sample reading: B1 FIRING · B2 STANDBY · P1 RUNNING

  3. An industrial controller you can open and read

    A Productivity 2000 controller from AutomationDirect runs the boilers, the pumps and the hot water. It's off the shelf and documented, and the program belongs to the building. If the internet drops, the building still heats.

    Sample reading: SUPPLY SENSOR → CONTROLLER INPUT 3 · 178.4°F

  4. Heat follows the weather up the building

    An outdoor sensor on the shady side tells the controller how cold it is, and it sets the water to match. The boilers take turns leading, and the pumps follow demand. On steam plants it changes how long the burner runs instead.

    Sample reading: OUTDOOR 41°F · TARGET 176°F · SUPPLY 178.4°F

  5. The same screen at both ends

    The panel sends its readings out, encrypted, through a gateway that only connects outward. Your login opens the same building card our engineers open.

    Sample reading: ON YOUR SCREEN · SUPPLY 178.4°

    See what the portal shows

Section A-A. Illustrative drawing and values.

An old aquastat holds one setpoint all winter

It overheats the building in October and falls behind in January. We replace it with a controller that reads the outdoor temperature and sets the water to match. Then you can see on the screen whether it's working.

Boiler and burner controls

Chart: a fixed aquastat holds the supply water at 180°F at every outdoor temperature. An outdoor reset curve asks for about 117°F when it's 60°F outside and about 201°F at 0°F, crossing the aquastat at 15°F. Above 15°F outside the aquastat runs too hot; below it, it falls short.

Illustrative curve. Yours is set at fall start-up.

From one walk-up boiler to a full plant

We design the sequence, wire the panel, program the controller and look after it.

  1. Outdoor reset, lead/lag, and the safeties checked and wired back.

    OUTDOOR RESET · ROTATION · SAFETIES

  2. Pump speed follows demand instead of running flat out all season.

    PUMP SPEED · ZONES · HOT WATER MIX

  3. One panel instead of a boiler control, a pump timer and a fan clock that never talk.

    ONE CONTROLLER · TOUCHSCREEN · MODBUS

  4. Supply, return, pump status and alarms on your phone, with the history behind them.

    ENCRYPTED, OUTBOUND ONLY · PORTAL

  5. Fall start-up, a tune after the first cold snap, spring shutdown.

    OCT · DEC · MAY

  6. Run time and reset-curve history you can hand to your energy consultant.

    LL97 · BENCHMARKING

Installs are a fixed price from a written scope. Monitoring is billed per building.

Open the panel and read the program

Everything in the cellar is off-the-shelf industrial hardware, and it stays readable after we leave.

Parts
AutomationDirect Productivity 2000, P2-550 CPU, off the shelf
License
No software license on the controller
Ownership
The program, the tag list and the drawings belong to the building
Service
Any qualified controls tech can open the panel and read the program
  1. Controller CPU and input/output modules
  2. Labelled terminal strip, wired back from every boiler and pump
  3. Touchscreen on the door, where setpoints change
  4. Cellular gateway, outbound only
  5. Drawing pocket with the tag list
Controller enclosure, door open. Illustrative drawing.
  1. Controller CPU and input/output modules
  2. Labelled terminal strip, wired back from every boiler and pump
  3. Touchscreen on the door, where setpoints change
  4. Cellular gateway, outbound only
  5. Drawing pocket with the tag list

B1 low water cutoff

Boiler 1 trips. Boiler 2 takes over, and the portal has the alarm in seconds.

What happens next, one event at a time

Illustrative.

We kept walking past boiler rooms running blind

We started as Nio Tech, running cabling and networks through New York buildings. Nobody knew the supply temperature until a tenant called. So we learned the controls side properly. The connection out of your boiler room is still built by people who do networks for a living.

Our story

We work in all five boroughs.

  • Manhattan
  • Brooklyn
  • Queens
  • The Bronx
  • Staten Island

Get an engineer into your boiler room

Send the address. We'll walk the room with your super and tell you in writing what the controls need.