Skip to content

Boiler, burner and pump controls for NYC buildings

One contractor from the first walk-through to the spring shutdown. We design it, install it and look after it.

Project
Nio Controls
Sheet
M-000 · Typical two-boiler cellar
Scale
Not to scale
Plan of a typical two-boiler cellar. Illustrative. Pick a number to jump to that service.
M-101

Boiler and burner controls

Most heating complaints in a New York apartment building trace back to the controls. An old aquastat holds one setpoint all winter, so the building overheats in October and falls behind in January. We replace it with a controller that reads the outdoor temperature and sets the boiler water to match the weather.

M-101
Plate M-101. Two-boiler lead/lag plant with outdoor reset. Illustrative drawing of a typical plant.

On steam plants the same idea changes how long the burner runs, not the water temperature. For plants with more than one boiler we add lead/lag rotation and staging, so the units share the load, run fewer short cycles and wear evenly. Every job keeps the existing safeties in the loop and adds the ones the code and your insurer expect to see.

Good fit for steam and hot-water buildings with one to four boilers, oil or gas, especially where nobody has touched the controls since the boiler went in.

What's included

  • Outdoor reset with night setback and warm-weather shutdown
  • Lead/lag rotation and staging for multi-boiler plants
  • Low-water cutoff, high-limit and flame safeguard wiring checks
  • Failed or obsolete controls replaced, with the burner left in place
  • Setpoints and schedules documented and posted in the boiler room
  • Hookup to remote monitoring if the building wants it
M-102

Pump and hydronic controls

Circulators run thousands of hours a season. Run flat out the whole time, they waste electricity and push hot water where nobody asked for it. We control them from the system: speed from differential pressure or temperature, start and stop from actual demand.

M-102
Plate M-102. Heating loop with a variable-speed circulator, a differential pressure sensor and two zone valves. Illustrative drawing.

We also set up zone control, so the sunny side and the shady side of the building don't get the same water. And we take care of domestic hot water (DHW): mixing valves, recirculation pumps and tank temperature, so showers are hot and nobody gets scalded.

Good fit for hot-water buildings with large circulators, buildings with uneven heat between lines or exposures, and any building where the DHW tank temperature swings.

What's included

  • Variable frequency drives on circulators and DHW recirculation pumps
  • Lead/standby pump rotation with automatic failover
  • Zone valves and zone pumps driven by indoor or outdoor conditions
  • Domestic hot water temperature control and mixing valve supervision
  • Pump run status and fault contacts wired back to the controller
M-103

Building automation

A boiler controller, a pump controller and a ventilation timer that don't talk to each other leave the super walking from panel to panel. We bring them onto one controller, so the building runs as one system and every point shows up in one place.

M-103
Plate M-103. Controller enclosure with sensors and run contacts landed on the terminal strip. Illustrative drawing.
TT-101
Supply
TT-102
Return
TT-103
Outdoor
TT-104
DHW
B1 RUN
Boiler 1
P1 RUN
Pump 1

Sample tag list. Yours is handed over with the drawings.

We standardize on Productivity 2000 controllers from AutomationDirect: industrial hardware, open protocols, parts on the shelf. A touchscreen in the boiler room shows status and lets authorized staff change setpoints. There's no software license on the controller. The program, the tag list and the drawings belong to the building.

Good fit for buildings replacing a dead or orphaned control system, new mechanical rooms, and portfolios that want the same hardware in every boiler room.

What's included

  • Productivity 2000 controller and I/O sized for the building, with spare points
  • Touchscreen in the boiler room for status and setpoint changes
  • Integration of boilers, pumps, ventilation fans and temperature sensors
  • Modbus or BACnet links to existing burner and boiler controls where supported
  • Documented tag list and wiring drawings handed to the building
  • Status and alarms published to the Nio Controls portal
M-104

Remote monitoring

Every control system we install can publish its status to the Nio Controls portal. You see supply and return temperatures, which boilers and pumps are running and any active alarms, from a phone or a desk, with the history behind them.

Sample building

Brooklyn · 2 boilers

Online

Supply
178.4°
Return
158.9°
Outdoor
41°
  • Boiler 1Running
  • Boiler 2Off
  • Pump 1Running

Supply, last 6 hours

Sample building. Not live data.

Sample building

Online

Supply
178.4°
Return
158.9°

Sample building. Not live data.

M-104
Plate M-104. The building card your login opens. Illustrative, with sample readings.

When something trips at 2 a.m., the alarm is on the portal within seconds, with the time it started. Text and email alerts are next on our list.

How monitoring works

Good fit for any building with controls we installed, and existing control systems that can expose status over Modbus or dry contacts.

What's included

  • Live boiler, pump and temperature status per building
  • Alarms with acknowledgement and offline detection
  • Trend charts and per-building history
  • Role-based access for management companies and supers
M-105

Service and maintenance

Controls drift. Sensors fail, setpoints get nudged by someone chasing a cold apartment, and last winter's schedule doesn't fit this one. On a service plan we start the plant up in the fall, tune it after the first cold snap and shut it down in the spring.

Service report

Sample building · Brooklyn · 2 boilers

SAMPLE

Visit
Fall start-up
Safeties tested
OK
Reset curve
180°F at 10°F outdoor, 120°F at 60°F
Notes
Boiler 2 lead for the season. Pump 1 bearings checked.
Plate M-105. Sample report from a fall start-up. Illustrative values.

The service year

  • Heat season, October 1 to May 31
  • Hot water only, June to September
  1. 1Fall start-up, early October
  2. 2Tune after the first cold snap
  3. 3Spring shutdown, end of May

We work alongside your boiler service company: we look after the controls, the sensors and the panel, and they keep the burner, the boiler and the fuel.

Good fit for any building with controls we installed, and buildings with existing controls that nobody is responsible for right now.

What's included

  • Fall start-up: safeties tested, sensors checked, reset curve set for the season
  • Mid-season tuning visit after the first cold snap
  • Spring shutdown and summer hot-water-only setup
  • Replacement parts for the controls we installed
  • Written service report after every visit
M-106

Energy data

Local Law 97 and annual benchmarking put numbers on how much fuel a building burns. Boards and managers get asked about those numbers and often have only utility bills to show. Controls data changes that.

M-106
Plate M-106. A week of supply water temperature against outdoor temperature. Illustrative.

We give you supply temperature, run time and outdoor temperature history, so you can show what changed after a controls upgrade and have a grounded conversation with your energy consultant or engineer. Your consultant files the paperwork and interprets the law. We make sure the data behind it is real.

Good fit for buildings covered by Local Law 97 or annual benchmarking, co-op and condo boards planning capital work, and managers fielding questions from owners.

What's included

  • Boiler run-time history per building
  • Supply and outdoor temperature trends that show the reset curve is working
  • Trend charts you can walk through with your energy consultant or engineer
  • Setpoint and schedule review ahead of the heating season
  • Plain-language summary of what the controls changed and when
M-107

How a job runs

  1. Step 01

    We walk the room

    With your super, noting what works.

  2. Step 02

    You get a written scope

    What we replace, what stays, the downtime.

  3. Step 03

    Changeover on a mild day

    With the downtime written into the scope.

  4. Step 04

    We leave the drawings

    Setpoints on the wall, tag list in the panel.

What stays in the boiler room

Pricing. Installs are a fixed price from the written scope. Monitoring is billed per building.

Setpoints and schedules
Posted on the wall
Tag list
In the panel's drawing pocket
Wiring drawings
As built
Controller program
Yours, on request
Service report
Written, after every visit

Not sure which of these you need?

Tell us the boiler's make and what it's doing, and an engineer will tell you which of these it needs.